Human–robot mixed aisles · AGV / AMR lane control

Block the person, not the sensor: mesh boundaries for human–robot aisles

A humanoid robot walking the pick face, six AMRs looping the same route and two pickers crossing between them — one aisle, one shift. The moment that aisle needs a physical boundary, most plants reach for a solid steel panel wall or a welded cage. Both stop the person; both also stop the LiDAR returns, the overhead machine-vision view, the fixed camera coverage and the supervisor’s line of sight across the floor. Mefence frameless 3D safety fence is the third option: an open Q235 welded mesh panel that keeps a person out of the robot lane and leaves the aisle readable from every angle. It is a demarcation and traffic-control fence — where a strike point needs certified containment, SGF routes that scope to its impact-rated Machine Fence line.

Yellow industrial safety fence panel with welded wire mesh, bolted floor plates, and rigid steel posts

Send us your aisle layout

What actually ships on a Mefence panel

The numbers below are the fence, not a brochure claim. There is no impact rating here, because Mefence is specified for area demarcation and traffic control — not as a crash-rated containment barrier.

Item Specification
Panel material Q235 carbon steel welded wire mesh, frameless (no perimeter frame)
Surface treatment Electrostatic powder coating (powder coated steel)
Wire diameter 3 mm / 4 mm
Mesh opening 20 × 100 mm / 50 × 50 mm
Panel width 200 – 1400 mm, trimmable on site
Panel height 200 – 3000 mm
Ground clearance 140 mm
Post 40 × 60 mm / 60 × 60 mm, base plate post with expansion bolt
Panel-to-post connection Plastic clip + self-tapping screw, no site welding
Standard colour Yellow + black (custom colours available, including orange)
Panel structure 3D pressed mesh with horizontal T-shaped ridges
Positioned for Area demarcation, traffic guidance, robot cell and equipment perimeter

Three panel details that decide how a robot aisle behaves

Bolted base plates and slotted holes keep the boundary where the layout says it is

Every Mefence post lands on a base plate fixed with expansion bolts, and the post face carries slotted mounting holes rather than round ones. On a retrofit that matters twice. First, the slot absorbs the few millimetres between the layout drawing and the anchor pocket that already exists in the slab, so the panel line stays straight without re-drilling or re-pouring. Second, nothing is welded: the run goes up on an occupied floor between shifts, with no hot-work permit, no fire watch and no grinding dust beside a live robot cell. The same base-plate detail works on a hard-trowelled slab, a mezzanine deck or a wall foundation line.

Industrial safety fencing panel with yellow steel posts, welded mesh, slotted mounting holes, and bolt-down base plates.

Modular segments turn random crossings into planned access points

An AMR lane rarely fails because the vehicle cannot see. It fails when people cross wherever they like and the vehicle emergency-stops — ghost downtime that never appears on a layout drawing. A Mefence run converts those crossings into planned access points: straight modules, L-corners and a gated opening placed where the layout says people should cross, so the route stays predictable for the fleet and for the picker. Panels run 200 – 1400 mm wide and 200 – 3000 mm high, and because there is no perimeter frame a panel can be cut down on site for the odd bay, the column line or the pipe that was never on the drawing. When the route is redrawn, the modules unbolt and move with it.

3D render of modular industrial safety fencing with yellow steel posts and welded wire mesh panels

Clip-fixed panels stay see-through — and the T-ridge carries the cable

Panels fix to posts with plastic clips and self-tapping screws: no square-tube welding in the factory and none on site. One person assembles a run in three steps, and the reference installation footage states a 50%+ reduction in installation time against conventional framed fence. The open welded mesh is the other half of the argument. Where a solid sheet returns nothing, a 20 × 100 mm or 50 × 50 mm mesh leaves the aisle visible for LiDAR, machine vision, cameras and the supervisor on the walkway. Each panel also carries horizontal T-shaped ridges pressed into the mesh; that ridge is a cable trough for camera, interlock, e-stop and door-control runs, and it accepts wood slat inserts where a plant wants visual shielding.

Industrial safety fence panel with welded steel mesh, yellow posts, and bolt-down base plates.

Where the mesh boundary is the right boundary

  • Robot workstation perimeter enclosure where the cell has to stay observable
  • AGV / AMR lane control along loop routes and pick-station approaches
  • Pedestrian–vehicle separation in mixed-traffic aisles
  • Forklift path barrier and traffic flow planning in warehouses
  • Warehouse zoning, storage area separation and tool crib enclosure
  • Automated equipment guarding around conveyors, transfer zones and picking stations
  • Stairs, mezzanines and elevated platform edge protection
  • Workshop isolation and temporary partitions during retrofit windows

Mefence is positioned for non-high-impact area demarcation. Where a robot, conveyor or forklift strike point needs certified containment, the layout is split into two scopes: Mefence for the demarcation and traffic lines, SGF’s impact-rated Machine Fence for the strike points. Standards buyers usually compare against — OSHA 29 CFR 1910.212, ISO 14120, ANSI B11.19 — are reviewed per project; the fence itself carries no certification claim.

Mefence layout pack for a human–robot aisle

Send the aisle width, the AMR route and the points where people are allowed to cross, and we return a panel schedule, the base-plate and slotted-hole fixing detail, a T-ridge cable-routing sketch and the clip-fix assembly sequence — the four documents an integrator needs to price and install a see-through aisle boundary.

Specify the boundary before the fleet goes live

Give us the aisle width, the robot envelope and the permitted crossing points. We will come back with a Mefence panel schedule, the floor-fixing detail and the cable-routing plan for that aisle — factory-direct, no site welding, and modules that follow the route when it changes.

Request the aisle layout review